The work conducted by the WATCH project is divided into seven work blocks, with WorkBlocks 1 to 6 concentrating on the science and the 7th responsible for management and training. The work done by the six WorkBlocks is interdependent as the outputs of past and future scenarios are cross-cutting across Feedbacks (WB5), Extremes (WB4) and population and land use (WB2). The flow of information is represented in the schematic.

Description of the seven WorkBlocks (WB's):
|
|
|